Fuses that blow, a board with no earth leakage protection, circuits nobody can name: the consumer unit is where an old installation shows its age, and where most electrical fires start.
What is included
Removal of the old board and fuses
New unit sized for your circuits, with 30 mA RCDs on every row
Surge protection module where the standard requires it
Every circuit identified and labelled
Full test report, in writing
Good to know
The power is off for about four hours, we plan the switch-over with you so the freezer and the home office survive it. When your project requires a Consuel attestation, we prepare and file the paperwork.